Net Metering in Delhi (2026)

Net Metering in Delhi (2026) — Complete Guide for BSES Rajdhani, BSES Yamuna & Tata Power DDL

Net Metering Delhi 2026: BSES & Tata Power Guide | Thermosun

Your solar panels generate electricity. On a bright Delhi afternoon, they often generate more than your home can use. Without net metering, that surplus power is simply wasted. With net metering, it flows back to your DISCOM’s grid and earns you credits that offset your evening and nighttime consumption — effectively making your electricity meter spin backwards during the day. For a city with Delhi’s combination of high tariffs, strong sunlight, and rising bills, this mechanism is the difference between a solar system that “reduces” your bill and one that virtually eliminates it.

Working with the best solar power company in Delhi ensures your net metering application is filed correctly the first time — avoiding the delays, rejections, and missed subsidy deadlines that cost homeowners weeks of waiting and sometimes the entire PM Surya Ghar subsidy. Best Solar Company in Delhi

This guide covers the complete net metering process for all three Delhi DISCOMs — BSES Rajdhani (BRPL), BSES Yamuna (BYPL), and Tata Power-DDL (TPDDL) — with verified 2026 timelines, charges, Delhi’s unique Generation Based Incentive (GBI), and a clear picture of what your solar system will actually earn you.

70–90%
Monthly Bill Reduction
₹3/unit
Delhi GBI (up to 3kW)
25–45 Days
Net Meter Approval Time
5 Years
GBI Incentive Duration

What is Net Metering?

Net metering is a billing mechanism that allows rooftop solar owners to export surplus electricity to the DISCOM grid and receive credits against their future consumption. In practical terms:

  • During the day, your solar panels produce electricity — some you use directly, excess goes to the grid
  • At night or on cloudy days, you draw from the grid as usual
  • At month end, you pay only for the net units — what you imported minus what you exported
  • If exports exceed imports in a month, credits carry forward to the next billing cycle
  • Annual surplus (April–March) is settled at APPC rate (₹3–₹4/unit) by the DISCOM

Your existing unidirectional meter is replaced by a bi-directional net meter — a DLMS-compliant smart meter that separately records import and export units. This is installed by your DISCOM as part of the net metering approval process.

Why Net Metering Changes Everything for Delhi Solar Users

Delhi’s electricity tariff structure makes net metering uniquely powerful. As of July 2026, DERC’s approved base tariff runs up to ₹8/unit for consumption above 800 units — and with PPAC surcharges running at BRPL 17.94%, BYPL 17.43%, and TPDDL 16.00%, effective per-unit costs for high-consumption households are approaching ₹9–₹10/unit.

Here’s why this matters for net metering: every unit your solar system exports to the grid offsets a unit you would have purchased at these high tariff rates. The financial value of each exported unit is not a fixed “feed-in tariff” — it’s the retail rate you’re avoiding. For Delhi households crossing the 400-unit subsidy threshold, that value is significant.

⚡ Net Metering vs No Net Metering — The Real Difference

Without net metering: Surplus generation during office hours (when nobody is home) is wasted. System only saves on units actually consumed simultaneously with generation.

With net metering: Every unit generated has monetary value, regardless of when it’s produced. A 5kW system generating 600 units/month offsets 600 units from your bill — whether you’re home or not.

This typically doubles the effective financial return of a rooftop solar installation in Delhi.

DERC Net Metering Regulations 2026

The Delhi Electricity Regulatory Commission has streamlined net metering under the Delhi Solar Policy 2024–2027. Here are the current technical limits applicable across all three DISCOMs:

ParameterResidentialCommercial / Industrial
System Capacity LimitUp to 100% of sanctioned loadUp to 100% of sanctioned load
Voltage230V single-phase (up to 5kW)415V three-phase (above 5kW)
Settlement PeriodApril to March (annual)April to March (annual)
Monthly CreditsCarried forward — no expiry within yearCarried forward — no expiry within year
Year-End SurplusPaid at APPC rate (~₹3–₹4/unit)Paid at APPC rate (~₹3–₹4/unit)
Inverter StandardAnti-islanding mandatory (DERC spec)Anti-islanding mandatory
Net Meter TypeDLMS-compliant bi-directionalDLMS-compliant bi-directional
GBI Eligibility✅ Yes — ₹2–₹3/unit for 5 years✅ Yes — ₹1/unit for 5 years
📌 Important 2026 Update: DERC moved from quarterly to monthly PPAC revisions from June 2026 onwards. This means your electricity tariff now adjusts monthly. The financial benefit of net metering — which offsets these rising charges — becomes even more valuable as PPAC hikes accelerate.

DISCOM-wise Net Metering Process in Delhi (2026)

Delhi has three electricity distribution companies, each with slightly different application portals, fee structures, and processing speeds. Here’s exactly how the process works for each:

BSES Rajdhani (BRPL)
📍 South Delhi & West Delhi — Dwarka, Vasant Kunj, Saket, Mehrauli, Malviya Nagar, Palam
  • Apply on rts.bsesdelhi.com
  • Feasibility check: 7–10 days
  • Site inspection: 10–15 days
  • Meter installation: 10–15 days
  • Agreement: OTP-based digital
  • Total: 30–45 days
BSES Yamuna (BYPL)
📍 East & Central Delhi — Karol Bagh, Laxmi Nagar, Shahdara, Mayur Vihar, Kalkaji
  • Apply on rts.bsesdelhi.com
  • Feasibility check: 10–12 days
  • Site inspection: 12–18 days
  • Meter installation: 12–18 days
  • Agreement: OTP-based digital
  • Total: 35–50 days
Tata Power DDL (TPDDL)
📍 North & North-West Delhi — Rohini, Pitampura, Model Town, Civil Lines, Shalimar Bagh
  • Apply on tatapower-ddl.com/solar
  • Feasibility check: 5–7 days
  • Site inspection: 7–10 days
  • Meter installation: 10–12 days
  • Agreement: Online digital process
  • Total: 25–35 days

Step-by-Step Process (Common to All DISCOMs)

1

Feasibility Approval

Before installation, your solar installer applies to the DISCOM for technical feasibility. The DISCOM checks whether the local distribution transformer can handle additional solar load from your area. This step happens before panels go on the roof.

⏱ 5–12 days depending on DISCOM
2

Installation by MNRE-Empanelled Vendor

Once feasibility is approved, the solar system is installed using ALMM-listed panels and a DERC-approved inverter with anti-islanding protection. Only installations by MNRE-registered vendors qualify for subsidy and net metering.

⏱ 2–4 days installation
3

Work Completion Report

Your installer submits a Work Completion Report to the DISCOM with photographs of the installed system, inverter documentation, and earthing/lightning arrester confirmation.

⏱ Submitted same day
4

DISCOM Site Inspection

A DISCOM engineer visits your property to verify: inverter anti-islanding settings, earthing and lightning arrester installation, manual disconnect switch (isolator) accessibility, and panel placement compliance.

⏱ 7–18 days depending on DISCOM
5

Bi-directional Net Meter Installation

Your existing unidirectional electricity meter is replaced with a DLMS-compliant bi-directional net meter. This meter separately records import and export units and is installed by the DISCOM at your property.

⏱ 10–15 days after inspection
6

Net Metering Agreement

A legal net metering agreement is signed between you and the DISCOM — now done digitally via OTP-based e-signing for all three Delhi DISCOMs. No office visit required.

⏱ Same day as meter installation
7

Commissioning Certificate & Subsidy

Once the net meter is active and the agreement is signed, the solar commissioning certificate is generated. This triggers the PM Surya Ghar subsidy application — you submit bank details on the portal and receive the subsidy via DBT within 30–60 days.

⏱ Subsidy: 30–60 days post-commissioning

Confused About the Net Metering Process?

Thermosun handles your complete DISCOM application, inspection coordination & subsidy processing. You don’t visit a single office.

DISCOM Timeline Comparison — BRPL vs BYPL vs TPDDL

Process StageBSES Rajdhani (BRPL)BSES Yamuna (BYPL)Tata Power DDL (TPDDL)
Feasibility Approval7–10 days10–12 days5–7 days ✅ Fastest
Site Inspection10–15 days12–18 days7–10 days ✅ Fastest
Net Meter Installation10–15 days12–18 days10–12 days
Agreement SigningOTP-based digitalOTP-based digitalOnline digital
Total Estimated Time30–45 days35–50 days25–35 days ✅ Fastest
Application Portalrts.bsesdelhi.comrts.bsesdelhi.comtatapower-ddl.com
PPAC Rate (Jun 2026)17.94%17.43%16.00% ✅ Lowest
📌 Note: Timelines above are typical for complete, correctly submitted applications. Missing documents or sanctioned load mismatches are the most common reasons for delays — often adding 2–3 weeks. A professional solar installation company in Delhi handles documentation to prevent this.

Documents Required for Net Metering in Delhi

Submitting complete and accurate documents from day one is the single most effective way to avoid delays. Here’s the full checklist:

  • Latest electricity bill — applicant name must match exactly
  • Property ownership proof — registered sale deed, GPA, or house tax receipt
  • Aadhaar Card — linked to registered mobile number for OTP
  • PAN Card — for subsidy bank transfer
  • Site photographs — showing installed solar panels on roof and meter cabin location
  • Inverter datasheet — confirming anti-islanding compliance (provided by installer)
  • Panel datasheets — confirming ALMM list compliance (provided by installer)
  • Single line diagram — electrical layout of the system (prepared by installer)
  • Bank account details — cancelled cheque for subsidy DBT credit
  • Signed declaration form — available on DISCOM portals
💡 Thermosun Tip: If your electricity bill is in a different name (landlord, parent, previous owner), you’ll need a No Objection Certificate (NOC) from the billed person along with a copy of their ID. Address this before installation day to avoid post-installation delays.

Net Metering Charges in Delhi — What You Actually Pay

One area where many homeowners are surprised: net metering is not free. Here are the standard charges across Delhi DISCOMs in 2026:

Charge TypeAmount (Approx.)Paid ToNotes
Net Meter Testing Fee₹2,000 – ₹5,000DISCOMVaries by system capacity
Meter Replacement Cost₹1,500 – ₹3,500DISCOMIncluded by some DISCOMs
Application Processing Fee₹500 – ₹1,500DISCOMOnline payment
Security Deposit (if revised)As applicableDISCOMUsually no additional deposit
Total Estimated Charges₹4,000 – ₹10,000Included in Thermosun quotes

Thermosun includes net metering application charges in all rooftop solar installation proposals — there are no surprise bills after the system is commissioned. Solar Panel Installation Delhi

Delhi GBI (Generation Based Incentive) — Your Extra Earnings Explained

Delhi’s Generation Based Incentive is what makes the capital’s solar policy arguably the most attractive in India. Unlike the PM Surya Ghar capital subsidy (a one-time upfront benefit), the GBI is an ongoing monthly cash reward for every unit your solar panels produce — for 5 full years from commissioning date.

₹3
per unit generated
Residential
Systems up to 3kW
₹2
per unit generated
Residential
Systems 3kW – 10kW
₹1
per unit generated
Commercial / Industrial
All system sizes

Key GBI Facts

  • GBI is paid on total solar generation — not just exported units. Every unit produced earns GBI, whether you consume it or export it.
  • GBI is adjusted against your monthly DISCOM bill first. Any surplus beyond your bill amount is credited to your bank account monthly.
  • No minimum generation requirement — even low-output months earn GBI
  • GBI runs for 5 years from commissioning date and then stops. The solar system continues generating for 20+ more years.
  • A functional net meter is mandatory to receive GBI
  • Commercial GBI may be subject to annual budget allocation caps

GBI Calculation Example — 5kW System in Delhi

💡 Combined Benefit: PM Surya Ghar subsidy (₹78,000 one-time) + Delhi GBI (₹72,000 over 5 years) = ₹1,50,000 in government benefits alone, over and above your monthly bill savings. This is why 2026 is genuinely the best year to install solar in Delhi.

Calculate Your GBI + Savings — Right Now

Enter your monthly bill and we’ll show you exact GBI earnings, bill savings, and payback period for your specific situation.

Net Metering for Housing Societies & Apartments in Delhi

If you live in an apartment or a builder floor without dedicated roof access, you’re not left out. Delhi’s Solar Policy 2024–2027 introduced several models specifically for this situation:

🏘️ Group Net Metering (GNM)

A housing society or RWA installs a solar system on the common rooftop and the generated electricity offsets bills across multiple individual connections within the same DISCOM area. The society pays for the installation; savings are distributed proportionally or as lower maintenance bills. Eligible for central subsidy at ₹18,000/kW for common facilities up to 500kW capacity.

🔗 Virtual Net Metering (VNM)

For consumers with multiple properties — or those who can’t install panels on their own roof — Virtual Net Metering allows solar generation from one location to offset bills at a different location within the same DISCOM territory. Ideal for builder floors, rented properties, or properties with shaded rooftops.

☀️ Community Solar

Delhi’s 2024–2027 policy introduces Community Solar where consumers without any roof access can purchase a “share” of a larger solar plant and receive proportional GBI credits on their monthly bill. This is still being rolled out by DISCOMs but represents the future of solar access for apartment dwellers.

📋 For Housing Societies: If your RWA is considering group net metering, contact Thermosun for a society-specific assessment. We handle DISCOM coordination, RWA documentation, and the full commissioning process for group installations. Rooftop Solar Installation Delhi

Commercial Net Metering in Delhi

Commercial and industrial consumers follow the same core net metering process as residential — but with important differences that affect cost, timeline, and financial returns.

ParameterResidentialCommercial / Industrial
System Size1kW – 10kW typical10kW – 500kW+
PhaseSingle-phase (up to 5kW)Three-phase mandatory above 5kW
GBI Rate₹2–₹3/unit₹1/unit
PM Surya Ghar SubsidyUp to ₹78,000Not applicable
Net Metering ApplicationPM Surya Ghar portalDISCOM commercial portal directly
Payback Period4–7 years3–5 years (higher consumption)
Technical RequirementsStandardProtection relay, APFC panel may be needed

For factories, schools, hospitals, offices, and hotels in Delhi NCR, commercial net metering typically delivers the fastest payback because daytime consumption is consistently high — maximising direct self-consumption of solar power at peak tariff rates. Solar Installation Company Delhi

Common Net Metering Mistakes — And How to Avoid Them

⚠️ Mistake 1: Solar Capacity Exceeding Sanctioned Load
You cannot install a 10kW system if your DISCOM-approved sanctioned load is only 5kW. The DISCOM will reject the net metering application immediately. If you need a larger system, apply for “Load Enhancement” first — a separate DISCOM process. Always verify your sanctioned load before finalising system size.
⚠️ Mistake 2: Name Mismatch on Electricity Bill
The electricity bill must be in the applicant’s name. If the bill is in a landlord’s, parent’s, or deceased relative’s name, you’ll need a No Objection Certificate and ID copy — prepare this before installation to avoid post-installation delays.
⚠️ Mistake 3: Using Non-ALMM Listed Panels
Installing panels not on the MNRE’s Approved List of Models and Manufacturers (ALMM) disqualifies your application from both the PM Surya Ghar subsidy and GBI. Always verify panel brand and model on the ALMM portal before signing any installation contract.
⚠️ Mistake 4: Meter Location Not Accessible
If your electricity meter is inside a locked garage, basement, or private room, the DISCOM may require you to shift the meter cabin to a boundary wall — at your own expense (₹10,000–₹30,000). Check meter accessibility before installation.
⚠️ Mistake 5: Choosing Non-Registered Solar Vendor
Only MNRE-empanelled vendors can file net metering applications on your behalf and qualify your system for PM Surya Ghar subsidy. Installing through an unregistered vendor means losing ₹78,000 in subsidy and GBI eligibility — verify MNRE registration before signing any contract.

Real Savings Example — 5kW System in Rohini, Delhi (Tata Power DDL Area)

Why Thermosun Is the Right Partner for Your Net Metering Application

Net metering is not just a paperwork formality — it directly determines whether your solar system pays back in 3 years or 6. A single missed document or incorrect panel specification can delay your commissioning by 4–6 weeks, costing you both GBI earnings and subsidy processing time. As the best solar company in Delhi, Thermosun manages this process end-to-end — so you don’t lose a single day of earnings to process errors.

📋 End-to-End DISCOM Coordination

We handle feasibility applications, inspection scheduling, meter testing, and agreement signing with BRPL, BYPL, and TPDDL — you don’t visit a single office.

✅ MNRE Registered — Subsidy Eligible

Every Thermosun installation qualifies for PM Surya Ghar subsidy and Delhi GBI. We’re registered on pmsuryaghar.gov.in and empanelled with all three Delhi DISCOMs.

🏛️ Government-Grade Experience

Completed solar projects at Delhi Fire Stations, Tees Hazari Court, and Tihar Jail — institutional credentials that reflect consistent quality and documentation standards.

⚡ ALMM-Listed Panels Only

We install only panels from Adani Solar, Waaree, Vikram Solar, and Tata Power Solar — all on the ALMM list, guaranteeing net metering and GBI eligibility.

📱 Post-Commissioning Support

After your net meter is installed, we help you read your bill correctly, verify GBI credits, and monitor system performance — support doesn’t stop at installation day.

🔍 1,000+ Installations in Delhi NCR

Over a thousand completed solar installations in homes, offices, and institutions across Delhi NCR. Our DISCOM application team knows exactly what each office requires.

Delhi NCR Areas Served by Thermosun

Thermosun provides rooftop solar installation and net metering coordination across all major Delhi NCR locations. Whether you’re served by BSES Rajdhani, BSES Yamuna, or Tata Power-DDL, our team handles the full process — from site survey to net meter activation.

Rohini
TPDDL
Pitampura
TPDDL
Shalimar Bagh
TPDDL
Model Town
TPDDL
Dwarka
BRPL
Vasant Kunj
BRPL
Saket
BRPL
Malviya Nagar
BRPL
Karol Bagh
BYPL
Laxmi Nagar
BYPL
Noida
Gurugram
Faridabad
Ghaziabad

Frequently Asked Questions

What is net metering in Delhi?
Net metering in Delhi is a billing arrangement where your solar panels export surplus electricity to the DISCOM grid (BSES or Tata Power-DDL) and you receive credits against your future consumption. At the end of each billing cycle, you only pay for the ‘net’ units — what you imported minus what you exported. This reduces monthly bills by 70–90% for most Delhi homeowners.
How long does net metering approval take in Delhi?
Tata Power-DDL (TPDDL) is the fastest at 25–35 days total. BSES Rajdhani (BRPL) takes 30–45 days, and BSES Yamuna (BYPL) typically takes 35–50 days. These timelines assume a complete and correct application — missing documents or sanctioned load issues can add 2–4 weeks. Thermosun’s documentation process is designed to minimise delays.
What is Delhi’s GBI (Generation Based Incentive) for solar?
Delhi’s GBI is a cash reward paid for every unit your solar panels generate, for 5 years from commissioning. Residential systems up to 3kW earn ₹3/unit, systems between 3kW–10kW earn ₹2/unit, and commercial systems earn ₹1/unit. The GBI is adjusted against your monthly DISCOM bill first, with any surplus deposited directly to your bank account — making it a genuine passive income stream from your solar system.
Which DISCOM area is BSES and which is Tata Power in Delhi?
BSES Rajdhani (BRPL) serves South and West Delhi — including Dwarka, Vasant Kunj, Saket, Malviya Nagar, and Palam. BSES Yamuna (BYPL) serves East and Central Delhi — including Karol Bagh, Laxmi Nagar, Shahdara, and Mayur Vihar. Tata Power-DDL (TPDDL) serves North and North-West Delhi — including Rohini, Pitampura, Model Town, Shalimar Bagh, and Civil Lines. Your DISCOM name appears in the top header of your electricity bill.
Does net metering work during a power cut in Delhi?
No. Standard on-grid solar systems shut down automatically during power cuts due to mandatory anti-islanding protection. This is a safety requirement under DERC regulations to prevent electrocution of DISCOM engineers working on the grid. For backup power during outages, you need a hybrid solar system with battery storage — which can be combined with net metering for the best of both worlds.
Can I get net metering in Delhi for an apartment or housing society?
Yes. Delhi supports Group Net Metering (GNM) where a society’s common rooftop solar offsets bills across multiple connections. Individual apartment owners can also explore Virtual Net Metering (VNM) — where solar generation from one property offsets bills at another — and the new Community Solar model for those with no rooftop access at all. Contact Thermosun for a society-specific assessment.
What are the net metering charges in Delhi?
Net metering charges in Delhi include a meter testing fee (₹2,000–₹5,000), meter replacement cost (₹1,500–₹3,500), and an application processing fee (₹500–₹1,500) — totalling approximately ₹4,000–₹10,000 depending on system size and DISCOM. Thermosun includes all DISCOM charges in project quotations with no post-installation surprises.
What happens to excess solar units at year-end in Delhi?
Delhi’s net metering settlement runs April to March annually. Surplus units are carried forward each month within the year. At March year-end, remaining credits are settled at the APPC rate — typically ₹3–₹4 per unit — paid directly to your bank account by the DISCOM. This is lower than the retail saving rate, so maximising self-consumption within the year is more financially advantageous.
Is net metering mandatory for the PM Surya Ghar subsidy?
Yes. A commissioned net meter and a signed net metering agreement with your DISCOM are mandatory requirements for releasing the PM Surya Ghar central subsidy of up to ₹78,000. The subsidy application can only be completed after the DISCOM confirms grid connectivity and net meter installation — which is why choosing an experienced solar installation company in Delhi that manages DISCOM coordination is critical to avoid subsidy delays.
Can I apply for net metering myself without a solar company?
Technically yes — but practically it’s not recommended. The application involves DISCOM-specific technical documentation (single-line diagrams, inverter compliance certifications, ALMM declarations) that only an experienced installer can prepare correctly. An incorrect submission typically adds 4–6 weeks of delay and sometimes results in rejection. Most homeowners find the process significantly smoother when managed by a registered solar installation company.

Conclusion

Net metering is the financial backbone of every rooftop solar investment in Delhi. Without it, your system saves only on units consumed simultaneously with solar generation. With it, every unit your panels produce has direct monetary value — day or night, whether you’re home or at work. Combined with Delhi’s unique GBI, which pays ₹2–₹3 per unit generated for five years, a well-sized net-metered solar system in Delhi delivers returns that are hard to match in any other investment category available to homeowners today.

The process itself — across BSES Rajdhani, BSES Yamuna, or Tata Power-DDL — is entirely manageable when handled by an experienced team that knows each DISCOM’s specific requirements. The common delays and rejections are almost entirely preventable with correct documentation and the right installer.

Thermosun Engineering and Power India Pvt. Ltd. has completed 1,000+ solar installations across Delhi NCR and manages the complete net metering process for every project — from first feasibility application to the final subsidy credit in your account. As a recognised best solar company in Delhi, we’re here to make the process as smooth for your home or business as we’ve made it for Delhi Fire Stations, Tees Hazari Court, and Tihar Jail.

☀️ Start Your Net Metering Journey Today

Free site survey, exact savings estimate, and complete DISCOM coordination — zero obligation.
Thermosun — Delhi NCR’s trusted solar EPC company.

✅ 1000+ Installations ✅ MNRE Approved ✅ All 3 DISCOMs ✅ GBI Processing ✅ Free Site Survey
📍 Sheikh Sarai, New Delhi – 110017  |  🌐 https://thermosun.in/

© 2026 Thermosun Engineering and Power India Pvt. Ltd.  |  Sheikh Sarai, New Delhi – 110017
GBI rates, PPAC surcharges, and DISCOM timelines are based on DERC orders and DISCOM notifications as of July 2026. Verify current rates before installation.