Thermosun Engineering and Power India Pvt. Ltd.

You can save up to 80%* on monthly electricity bills. Get a quote!
PM Surya Ghar Muft Bijli Yojana · Delhi

Get Up to ₹78,000 Subsidy on Rooftop Solar in Delhi with Thermosun

MNRE-approved, government-empanelled EPC handling your entire BRPL, BYPL & TPDDL paperwork — survey to subsidy, end to end.

Rooftop solar installation for a Delhi family
Applications open now
1 crore household target closes:
days
hrs
mins
₹78,000Max Central Subsidy
3 DISCOMsBRPL · BYPL · TPDDL Handled
30-YrPerformance Warranty
MNREApproved Components Only
The Scheme, In Plain Terms

What Is PM Surya Ghar Muft Bijli Yojana?

Launched by the Central Government in February 2024, this is India’s flagship rooftop solar programme. Eligible households get up to ₹78,000 credited straight to their bank account for installing a grid-connected rooftop solar system — no agent commission, no middlemen. In Delhi, that subsidy stacks on top of what an average 3 kW system already saves you on BRPL, BYPL or TPDDL bills every month.

Thermosun manages your file from the pmsuryaghar.gov.in registration to the final DBT credit — you don’t touch a government portal yourself.

Indian family with solar installer at work
Why Go Solar Now

What Delhi Homeowners Actually Gain

  • Direct government subsidy of up to ₹78,000 credited to your account
  • Electricity bills cut by 70–90% within the first billing cycle
  • 25+ years of clean power generation from one installation
  • Protection against future DISCOM tariff hikes
  • Higher resale value for independent houses and builder floors
Rooftop solar panels close-up
Subsidy Breakdown

What You Actually Save, Slab by Slab

Central subsidy runs at ₹30,000/kW for the first 2 kW and ₹18,000 for the 3rd kW — capped at ₹78,000 regardless of whether you install a 3 kW or 5 kW system.

System SizeCentral SubsidyApprox. Cost (Delhi)Your Net Cost
1 kW₹30,000₹65,000 – ₹75,000₹35,000 – ₹45,000
2 kW₹60,000₹1,20,000 – ₹1,35,000₹60,000 – ₹75,000
3 kW₹78,000₹1,80,000 – ₹1,95,000₹1,02,000 – ₹1,17,000
5 kW₹78,000 (capped)₹2,80,000 – ₹3,10,000₹2,02,000 – ₹2,32,000

Final pricing depends on your roof condition and shadow-free area — Thermosun’s free site survey gives you an exact, written number before you sign anything.

Before You Apply

Eligibility & Documents

  • You should be an Indian resident with a valid Aadhaar
  • The property must be residential (commercial/industrial follow a separate net-metering route)
  • You should hold ownership or roof rights for the property
  • You need an active BRPL, BYPL, or TPDDL electricity connection
  • At least 80 sq. ft. of shadow-free rooftop space per kW
Installer checking documents for PM Surya Ghar Yojana
🪪

Aadhaar Card

Latest Electricity Bill

🏦

Bank Account Details

📄

Roof Ownership Proof

📷

Passport-size Photo

BRPL · BYPL · TPDDL

How Thermosun Gets You From Application to Subsidy

Delhi runs on three different DISCOMs, each with its own portal logic and inspection calendar. Here’s exactly how we move your file through all of it.

01

Portal Registration

We register you on pmsuryaghar.gov.in and map your consumer number to the correct DISCOM.

02

Load Feasibility Check

We pre-verify your sanctioned load so DISCOM approval doesn’t stall your file.

03

Free Site Survey

Our engineer inspects your roof, shadow pattern, and finalises the right system size.

04

ALMM Installation

Only MNRE-listed panels and inverters go up — required for subsidy eligibility.

05

DISCOM Inspection & Net Meter

We coordinate the inspection and get your bi-directional meter commissioned.

06

Subsidy Disbursed

Commissioning certificate goes up on the portal, and your ₹78,000 lands in your account within 30 working days.

Why Thermosun

Not Just Installers — Your Subsidy Case Managers

🏛️

MNRE & Govt. Empanelled

Every install qualifies cleanly for the full central subsidy — no eligibility disputes later.

📋

Full Liaisoning

DISCOM registration to final DBT credit — we chase the paperwork, not you.

Bills Near Zero

Households across Rohini, Dwarka & Janakpuri now run near-zero monthly bills on our 3–5 kW systems.

🛠️

Local 25-Yr Support

Delhi-based service team for cleaning, monitoring, and warranty — not a distant call centre.

FAQs

PM Surya Ghar Yojana Delhi — Common Questions

How long does the PM Surya Ghar application take to clear in Delhi?

Usually 3–5 weeks from portal registration to net-metering commissioning, depending on your DISCOM’s inspection slot. Thermosun pre-checks every document before filing to avoid the delays most self-applicants hit.

How much rooftop space does a 3 kW system need?

Around 250–300 sq. ft. of shadow-free roof. Most Delhi independent houses and builder floors fit this easily — our free site survey confirms your exact number.

How does net metering change my BRPL, BYPL or TPDDL bill?

Your bi-directional meter nets off what you draw from the grid against what your panels export. You’re billed only on the difference, and surplus units can carry forward as per your DISCOM’s policy.

How do I confirm a vendor is actually authorised for this scheme?

Check the vendor against the empanelled list on pmsuryaghar.gov.in or your DISCOM’s rooftop solar page. Thermosun’s MNRE and DISCOM empanelment can be verified there before you book a survey.

Ready to Cut Your Delhi Electricity Bill to Near-Zero?

Book a free rooftop survey — our team covers every DISCOM zone in Delhi within 24–48 hours.

Call Now — Get Free Site Visit →