📋 Table of Contents
- Project Overview & Highlights
- Building a New House? Plan the Roof for Solar Before the Slab Is Cast
- KSolare Inverter & LT Box — What’s on the Wall
- Net Metering With BRPL Explained
- What You Can Expect to Save, by System Size
- What Thermosun Handled — Start to Finish
- Why Choose Thermosun
- Frequently Asked Questions
The Najafgarh side of West Delhi is growing fast, and a lot of that growth is brand-new houses going up on freshly bought plots. The photo above, taken at Baprola on 13 November 2026, shows the stage many of those homes are at — a roof still being finished, with construction work going on around the solar frame. Thermosun completed this rooftop solar installation at a Baprola property while the building was still taking shape, which makes it a good moment to share something we wish more people knew: the cheapest, neatest time to plan a solar system is before the roof is finished, not after.
Project Overview & Highlights
This Baprola installation uses a tall galvanized steel frame with cross-bracing between the columns, set inside the terrace’s parapet walls. Here’s what was delivered:
Building or Renovating in Baprola or Najafgarh?
Talk to a solar installation company Delhi homeowners trust before your roof is finished. A free site survey — even from the plan stage — can save you money and rework.
📞 Call Now 📄 Free Site SurveyBuilding a New House? Plan the Roof for Solar Before the Slab Is Cast
🏗️ The Core Idea
Retrofitting solar onto a finished roof means drilling, waterproofing repairs and surface-run cables. Planning for it during construction costs almost nothing and gives a cleaner, more durable result.
If you’re building in Najafgarh, Baprola or anywhere else in Delhi, here’s what’s worth settling with your architect, contractor and solar installer while the structure is still going up:
✅ The New-Build Solar Checklist
- Keep the sunny side clear. In Delhi, panels face south, so place water tanks, the staircase room and any lift or machine room towards the north of the roof where they won’t cast shade over the array.
- Mind the parapet. A tall parapet on the south side can shade low-mounted panels, especially in winter. Tell your designer solar is coming.
- Fix the foundation points early. Anchor plinths or embedded bolts can be set while the slab is cast, which avoids drilling into finished, waterproofed concrete later.
- Leave spare conduit. A conduit path from the roof down to the meter and distribution board, laid during construction, means no cables running across walls afterwards.
- Choose the equipment wall. A sheltered, ventilated spot near the meter for the inverter and panel boxes, away from direct rain.
- Plan earthing pits. Reserve a location where they can be dug and checked later.
- Waterproof first. Complete the roof waterproofing before the solar frame goes on, and seal any mounting points properly.
- Sort the electricity connection. Net metering generally requires a regular domestic connection in the owner’s name, and a temporary construction connection typically doesn’t qualify — so time the permanent connection with the solar plan, and consider your sanctioned load and phase requirement.
None of this adds meaningful cost, but it changes what a rooftop solar installation Delhi families end up with — a tidier system, fewer roof penetrations and no shading surprises. It’s also easier to match the roof to a correctly sized solar system when the design is still on paper.
KSolare Inverter & LT Box — What’s on the Wall
This installation uses a KSolare grid-tied inverter to convert the panels’ DC output into grid-ready AC power. The second photo shows the LT (low-tension) box on the wall — a sturdy metal enclosure where the heavy-gauge cabling is routed, with a green earth wire visible alongside it. Cabling here runs in conduit and secured along the wall rather than hanging loose, which is the standard to aim for.
Net Metering With BRPL Explained
Najafgarh, Baprola and the surrounding West and South-West Delhi belt fall under BSES Rajdhani Power Limited (BRPL). After commissioning, Thermosun files the net metering application with BRPL, coordinates the inspection, and has the bi-directional meter installed. That meter records the units you draw from the grid and the surplus your system exports separately, and BRPL nets the two off at each billing cycle — which is how generation turns into bill savings.
What You Can Expect to Save, by System Size
The right size depends on your roof and your bill. As a guide, a rooftop solar system in Delhi averages roughly 120–130 units a month per kW installed. These are estimated average monthly benefits (bill reduction plus Delhi GBI) for a household that consumes enough to use the generation; low-bill homes will see less, and winter months run below summer:
| System Size | Estimated Monthly Benefit | Estimated Annual Benefit |
|---|---|---|
| 3 kW | ₹3,200 – ₹4,400 | ₹38,400 – ₹52,800 |
| 5 kW | ₹4,000 – ₹5,750 | ₹48,000 – ₹69,000 |
| 8 kW | ₹8,100 – ₹10,700 | ₹97,200 – ₹1,28,400 |
| 10 kW | ₹11,300 – ₹14,700 | ₹1,35,600 – ₹1,76,400 |
Send us a recent electricity bill — or, for a new house, your expected load — and we’ll tell you which row actually applies to you.
📊 Solar Subsidy for Delhi Homes
Under the currently documented structure, a residential system of 3kW or above receives the ₹78,000 PM Surya Ghar central subsidy plus up to ₹30,000 in Delhi state capital subsidy (₹10,000/kW, capped at 3kW) — a combined ₹1.08 lakh, which doesn’t rise with system size, with the Delhi GBI paying per-unit income on top. Delhi has also announced a revised scheme for eligible low-consumption households, but it isn’t live on the official portal yet — see our Delhi Solar Subsidy 2026 guide for what’s confirmed and what isn’t.
What Thermosun Handled — Start to Finish
- 1Site Survey During Construction Roof layout, parapet, water tank position and the unfinished surroundings assessed before the frame was designed.
- 2Tall X-Braced Frame Design Galvanized steel structure designed for the terrace, with cross-bracing between columns.
- 3Procurement of ALMM-Approved Components Panels and KSolare inverter sourced from the MNRE-approved list for subsidy eligibility.
- 4Panel Installation Array mounted and wired across the elevated frame.
- 5Inverter, LT Box & Wiring Inverter installed and cabling routed through the LT box, conduit-protected and earthed.
- 6Safety Compliance Earthing and protective wiring documented to IS standard.
- 7BRPL Inspection & Net Meter Net metering application filed, inspection coordinated, bi-directional meter to be installed.
- 8PM Surya Ghar & Delhi GBI Filed Subsidy and GBI applications submitted, bank details confirmed for DBT processing.
Solar Installation in Najafgarh & Across South-West Delhi — We Cover Your Area
As a solar EPC company in Delhi handling design, installation, net metering and subsidy paperwork, Thermosun serves Najafgarh, Baprola, Nangli Vihar, Uttam Nagar and Dwarka directly.
💬 WhatsApp Now 📄 Free Site SurveyWhy Choose Thermosun
It’s much easier to get solar right when someone is involved early — before the slab, the parapet and the water tank have been fixed in the wrong places. Being willing to talk to a homeowner at the plan stage, rather than only when the roof is finished, is how we approach every solar for home project in the Najafgarh belt and across the city. With over 1,000 installations behind us, that practical, plan-first mindset is a large part of why customers call Thermosun the best solar company in Delhi for homeowners who want it done properly the first time.
More Real Installations Across Delhi
- 3kW Solar Installation in Uttam Nagar, West Delhi
- 5kW Solar Installation in Dwarka Sector 11
- 10kW Commercial Solar on an Under-Construction Building, Ghaziabad
- 4kW Solar Installation in Karol Bagh — Storm-Ready Structure
Frequently Asked Questions
Should I install solar while my house is still being built?
Plan for it during construction, and install once the roof is waterproofed and finished. Settling tank positions, parapet height, anchor points, conduit paths and the electricity connection early avoids drilling, rework and shading problems later.
What should I plan on the roof for a future solar system?
Keep the south side clear of tanks and staircase rooms, avoid tall south parapets, set anchor points while casting the slab, leave spare conduit to the meter and distribution board, reserve a sheltered spot for the inverter, and plan earthing pits.
Can I get net metering on a new house?
Net metering generally requires a regular domestic electricity connection in the owner’s name; a temporary construction connection typically doesn’t qualify. Time your permanent connection with your solar plan, and confirm the exact requirements with your DISCOM or installer.
Which DISCOM handles net metering in Najafgarh and Baprola?
Najafgarh, Baprola and the surrounding West and South-West Delhi belt fall under BSES Rajdhani Power Limited (BRPL). Net metering applications for this area go through BRPL’s system.
Does Thermosun install rooftop solar in Najafgarh?
Yes. Thermosun serves Najafgarh, Baprola, Nangli Vihar and the wider South-West Delhi belt, handling design, installation, net metering and subsidy paperwork.
How much solar subsidy does a home get in Delhi?
Under the currently documented structure, a residential system of 3kW or above receives the ₹78,000 PM Surya Ghar central subsidy and up to ₹30,000 Delhi state capital subsidy — ₹1.08 lakh combined — plus the Delhi GBI. Confirm the latest figures on the official portal before applying.
How much can I save with solar in Najafgarh?
It depends on system size and consumption. As an estimate, a 3kW system earns roughly ₹3,200–₹4,400 a month and a 5kW system roughly ₹4,000–₹5,750, with winter months lower. A free survey with your bill gives you your own figure.
Conclusion
This Baprola installation, completed while building work continued around it, shows how much easier solar becomes when it’s part of the plan rather than an afterthought. A tall cross-braced frame, a properly routed and earthed LT box, correct BRPL net metering and an early conversation about the roof are what make a solar system in the Najafgarh belt neat, durable and well placed. For anyone building or renovating in Najafgarh, Baprola, Nangli Vihar or anywhere in Delhi who’d like their solar system planned in from the start, a free site survey — even from the drawing stage — is the best first step.